CONSTRUCTION AND CALIBRATION OF THE NEBRASKA COOPERATIVE HYDROLOGY STUDY (COHYST) GROUNDWATER-FLOW MODELS
PETERSON, Steven M., Central Nebraska Public Power and Irrigation District, P.O. Box 740, 415 Lincoln Street, Holdrege, NE 68949, speterson@cnppid.com, LUCKEY, Richard R., US Geol Survey, PO Box 25046, Denver, CO 80225-0046, CARNEY, Clint P., Water Resources Divsion, Nebraska Public Power District, 402 E. Statefarm Rd, North Platte, NE 69101, and CANNIA, Jim, North Platte Natural Resources District, 1054 Rundell Road, P.O. Box 36, Gering, NE 69341

The primary products of COHYST are groundwater-flow models that can be used to analyze the effects of water-management activities proposed under the Three-State Cooperative Agreement between Nebraska, Wyoming and Colorado. A fundamental step in this process is the calibration of groundwater-flow models of the area.

The 29,300 square-mile study area in central and western Nebraska was divided into three model units, which overlap adjoining units by at least 12 linear miles along the river (COHYST Flow Modeling Strategy, at http://cohyst.nrc.state.ne.us/cohyst_data.html). Ideally, initial models should simulate conditions prior to any surface-water or groundwater development, when the flow system was in dynamic equilibrium (steady state). However, surface water irrigation occurred in the study area as early as the 1890s. The lack of data makes formal calibration for that time period impractical. The flow system is assumed to have been in equilibrium with the effects of early canal operations by the time major groundwater development for irrigation began in the 1950s. Therefore, the pre-groundwater development period was defined as prior to 1946. Sufficient calibration data exist for 1946 and later over much of the area. Pre-groundwater development models were calibrated against observed water levels and estimated groundwater discharge to streams.

Initially, single-layer groundwater-flow models were constructed with 4 square- mile cells. The final goal is to construct and calibrate transient groundwater-flow models for the period 1949-1997, with ¼ square-mile cells and multiple hydrostratigraphic layers. Several intermediate models were constructed to incorporate increasing complexity as refined geologic or net recharge data became available. All models were calibrated against observed water levels and groundwater discharge to streams, and transient models also were calibrated against water-level change maps.

2002 Denver Annual Meeting (October 27-30, 2002)
Session No. 102
The Platte River Basin of Colorado, Nebraska, and Wyoming: Where Geology, Hydrology, Endangered Species, People, and Politics Attempt to Coexist
Colorado Convention Center: A102/104/106
1:30 PM-5:30 PM, Monday, October 28, 2002
 

© Copyright 2002 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.