| 2004 Denver Annual Meeting (November 7–10, 2004) | |
| Paper No. 11-13 | |
| Presentation Time: 11:15 AM-11:30 AM | ||
GEOCHEMISTRY OF DUST IN THE PROPOSED NUCLEAR WASTE REPOSITORY AT YUCCA MOUNTAIN, NEVADA | ||
|
PETERMAN, Zell E.1, NEYMARK, Leonid A.2, and PACES, James B.2, (1) U.S. Geol Survey, MS 963 Box 25046 DFC, Denver, CO 80225, peterman@usgs.gov, (2) U.S. Geol Survey, Box 25046, MS963, Denver Federal Center, Denver, CO 80225-0046 Dust eventually will contact waste canisters in the proposed repository at Yucca Mountain, and its potential for facilitating corrosion must be evaluated. Samples of construction dust were collected from the Exploratory Studies Facility, an 8-km-long tunnel adjacent to the repository block, and from the Enhanced Characterization of the Repository Block, a 2.7-km-long drift across the repository block. Bulk samples and size fractions of dust were analyzed by conventional rock-analysis methods for major and trace elements, and water leachates were analyzed for soluble anions and cations. About 95-98 percent of the dust is finely ground rock generated during tunnel construction. The water-soluble salts, which are only about 0.4 percent of the total mass, contain Ca2+, Mg2+, Na+, K+, NH4+, Cl-, Br-, F-, HCO3-, NO3-, SO42-, and PO43-. These salts originate from evaporation of construction water and pore water at tunnel walls. Specific soluble salt minerals have not yet been identified, but normative minerals include calcite and dolomite; nitrates of potassium, sodium, and ammonia; and sulfates, such as glauberite and thenardite. The ratio of NO3- to Cl- is important for determining if calcium chloride, a potentially corrosive compound, could form from solution and reprecipitation of these salts. A molar ratio greater than 0.5 is considered to be favorable for suppressing the formation of calcium chloride (Carl Steefel, Lawrence Berkeley National Laboratory, written commun., May 19, 2004). Mean NO3-/Cl- ratios of soluble salts from various size fractions of dust range from 1.0±0.2 to 1.8±0.5 (uncertainties are standard errors of the mean.). After emplacement, atmospheric dust may enter the proposed repository and contact the waste canisters. The mean soluble-salt content of atmospheric dust samples around Yucca Mountain is13.3±1.0 weight percent (Marith Reheis’s USGS Open-File Report 03-138) with a mean NO3-/Cl-ratio of 5.6±1.1 (unpublished data from John Izbicki, U.S. Geological Survey, April 23, 2004). Thus, both construction dust and atmospheric dust have benign NO3-/Cl- ratios that may mediate the lower average ratio of 0.10±0.02 in salts derived from pore-water seepage. | ||
|
2004 Denver Annual Meeting (November 7–10, 2004)
General Information for this Meeting | ||
| Handout (.ppt format, 4280.0 kb) | ||
| Session No. 11 Geologic Disposal of Radioactive Waste: Rising to the Challenge of Regulatory Requirements and Environmental Protection at the Waste Isolation Pilot Plant (WIPP) Near Carlsbad, New Mexico, and the Yucca Mountain Site, Southern Nevada I Colorado Convention Center: 203 8:00 AM-12:00 PM, Sunday, November 7, 2004 Geological Society of America Abstracts with Programs, Vol. 36, No. 5, p. 34 | ||
© Copyright 2004 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions. | ||