2006 Philadelphia Annual Meeting (22–25 October 2006)
Session No. 219 Wednesday, 25 October 2006
1:30 PM-5:30 PM, Pennsylvania Convention Center: 105 AB

T81. Physical, Chemical, and Biological Controls on Remediation of Chlorinated Solvents in Fractured Rock

Allen M. Shapiro and Francis H. Chapelle, Presiding
 Paper #Start Time
219-11:30 PM BIOREMEDIATION OF FRACTURED ROCK CONTAMINATED WITH CHLORINATED SOLVENTS: STATE-OF THE ART AND REMAINING CHALLENGES: KINNER, Nancy E., Bedrock Bioremediation Center, University of New Hampshire, Gregg Hall, 35 Colovos Road, Durham, NH 03824, nancy.kinner@unh.edu
219-21:45 PM DISTRIBUTION, TRANSPORT, AND BIODEGRADATION OF TCE IN FRACTURED SEDIMENTARY ROCKS OF THE NEWARK BASIN AT THE NAVAL AIR WARFARE CENTER, WEST TRENTON, NJ: GOODE, Daniel J.1, TIEDEMAN, Claire R.2, LACOMBE, Pierre J.3, IMBRIGIOTTA, Thomas E.3, CHAPELLE, Francis H.4, BRADLEY, Paul4, SHAPIRO, Allen M.5, JOHNSON, Carole D.6, WILLIAMS, John H.7, and REVESZ, Kinga5, (1) U.S. Geological Survey, 770 Pennsylvania Drive, Suite 116, Exton, PA 19341, djgoode@usgs.gov, (2) U.S. Geological Survey, 345 Middlefield Rd. MS496, Menlo Park, CA 94025, (3) U.S. Geological Survey, 810 Bear Tavern Road, West Trenton, NJ 08628, (4) US Geological Survey, 720 Gracern Rd Ste 129, Columbia, SC 29210, (5) U.S. Geological Survey, 12201 Sunrise Valley Drive, Mail Stop 431, Reston, VA 20192, (6) U.S. Geol Survey, Office of Ground Water, 11 Sherman Place U-5015, Storrs, CT 06269, (7) U. S. Geological Survey, 425 Jordan Road, Troy, NY 12180
219-32:00 PM HYDROGEOLOGIC FRAMEWORK BASED ON VAN HOUTEN CYCLIC STRATIGRAPHY, TECTONICS, AND WEATHERING, NAVAL AIR WARFARE CENTER, TRENTON, NEW JERSEY: LACOMBE, Pierre J.1, IMBRIGIOTTA, Thomas E.1, SMOOT, Joseph P.2, BURTON, William C.3, and HERMAN, Gregory C.4, (1) U.S. Geological Survey, 810 Bear Tavern Road, West Trenton, NJ 08628, placombe@usgs.gov, (2) US Geol Survey, 926A National Ctr, Reston, VA 20192, (3) Reston, VA 20192, (4) New Jersey Geological Survey, P.O. Box 427, Trenton, NJ 08625
219-42:15 PM BIOAUGMENTATION FOR TCE REMEDIATION IN FRACTURED BEDROCK: DEFLAUN, Mary F. and DREW, Scott, GeoSyntec Consultants, 3131 Princeton Pike, Building 1B, Suite 205, Lawrenceville, NJ 08648, mdeflaun@geosyntec.com
219-52:30 PM CARBON MONOXIDE CONCENTRATIONS AS A TRACER OF RECHARGE EVENTS TO FRACTURED-ROCK AQUIFERS: CHAPELLE, Francis H. and BRADLEY, Paul M., US Geological Survey, 720 Gracern Rd Ste 129, Columbia, SC 29210-7658, chapelle@usgs.gov
219-62:45 PM FATE AND TRANSPORT OF VOLATILE ORGANICS THROUGH EXTENSIONAL FRACTURE NETWORKS AND STRATIGRAPHIC PARTINGS IN THE PASSAIC FORMATION, CENTRAL NEWARK BASIN OF NEW JERSEY: BOND, Robert M., LINNELL, Katherine, TANWAR, Simriti, and KELLY, Kevin, Langan Engineering & Environmental Services, P.O. Box 1569, Doylestown, PA 18901-0219, bbond@langan.com
219-73:00 PM TIME OF REMEDIATION ESTIMATES AT A NAPL-CONTAMINATED FRACTURED-ROCK SITE: WIDDOWSON, Mark and MENDEZ, Eduardo, Department of Civil and Environmental Engineering, Virginia Tech, 220A Patton Hall, Blacksburg, VA 24061, mwiddows@vt.edu
219-83:15 PM REMEDIATION OF PCE DNAPL IN FRACTURED BEDROCK USING MOLASSES AND ZVI: MARTIN, Jennifer P., KILLENBECK, Eric, HORST, John F., and LENZO, Frank, ARCADIS, 6 Terry Drive, Suite 300, Newtown, PA 18940, jmartin@arcadis-us.com
 3:30 PM Break
219-93:45 PM USE OF ELECTRICAL RESISTIVITY AND SURFACE-WAVE SEISMIC IMAGING METHODS TO CHARACTERIZE THE GEOLOGIC FRAMEWORK OF THE NAWC SITE, WEST TRENTON, NEW JERSEY: JOHNSON, Carole D., U S Geological Survey, Office of Ground Water, Branch of Geophysics, 11 Sherman Place Unit-5015, Storrs, CT 06269, cjohnson@usgs.gov, WHITE, Eric A., U. S. Geological Survey, Office of Ground Water, Branch of Geophysics, 11 Sherman Place U-5015, Storrs, CT 06269, eawhite@usgs.gov, IVANOV, Julian, University of Kansas/Kansas Geological Survey, 1930 Constant Ave, Lawrence KS, 66047, and LANE, John W. Jr, Office of Ground Water, Branch of Geophysics, US Geological Survey, 11 Sherman Place, Unit 5015, Storrs, CT 06269
219-104:00 PM USE OF CROSS-HOLE FLOWMETER LOGGING TO CHARACTERIZE FRACTURE CONNECTIVITY AND FRACTURE FLOW DURING A PUMPING TEST AT THE NAWC SITE, WEST TRENTON, NEW JERSEY: JOHNSON, Carole D., U.S. Geol Survey, Office of Ground Water, 11 Sherman Place U-5015, Storrs, CT 06269, cjohnson@usgs.gov and WILLIAMS, John H., U. S. Geological Survey, 425 Jordan Road, Troy, NY 12180
219-114:15 PM COMPARISON OF THE FLUTE HYDRAULIC CONDUCTIVITY PROFILING RESULTS WITH STRADDLE PACKER MEASUREMENTS: KELLER, Carl, 6 Easy St, Santa Fe, NM 87506, carl@flut.com
219-124:30 PM AN INNOVATIVE BOREHOLE APPARATUS FOR CHARACTERIZING DEPTH-DEPENDENT MICROBIAL ACTIVITY AND GROUND-WATER CHEMISTRY IN FRACTURED ROCKS AT THE NAVAL AIR WARFARE CENTER, WEST TRENTON, NJ: SHAPIRO, Allen M.1, TIEDEMAN, Claire R.2, GOODE, Daniel J.3, BRADLEY, Paul M.4, CHAPELLE, Francis H.4, IMBRIGIOTTA, Thomas E.5, LACOMBE, Pierre J.5, ROSMAN, Robert5, and VROBLESKY, Don A.4, (1) U.S. Geological Survey, 12201 Sunrise Valley Drive, Mail Stop 431, Reston, VA 20192, ashapiro@usgs.gov, (2) U.S. Geological Survey, 345 Middlefield Rd. MS496, Menlo Park, CA 94025, (3) U.S. Geological Survey, 770 Pennsylvania Drive, Suite 116, Exton, PA 19341, (4) US Geological Survey, 720 Gracern Rd Ste 129, Columbia, SC 29210, (5) U.S. Geological Survey, 810 Bear Tavern Road, West Trenton, NJ 08628
219-134:45 PM THE EFFECTS OF ELIMINATING FRACTURES BELOW SPECIFIED THRESHOLDS WHEN MODELING DISSOLVED-PHASE DNAPL MIGRATION IN CRYSTALLINE ROCK: WELLMAN, Tristan P.1, SHAPIRO, Allen2, and HILL, Mary1, (1) Water Resources Division, U.S. geological Survey, 3215 Marine Street, Boulder, CO 80303, twellman@usgs.gov, (2) Water Resources Division, U.S. geological Survey, 431 mail stop, National Center, 12201 Sunrise Valley Drive, Reston, VA 20192
219-145:00 PM IN SITU REMEDIATION OF FRACTURED BEDROCK DNAPL SITES USING CHEMICAL OXIDATION: MACKINNON, Leah, KONZUK, Julie, O'HARA, Suzanne, HOOD, Eric, BERRY-SPARK, Karen, and COX, Evan, GeoSyntec Consultants, 130 Research Lane, Suite 2, Guelph, ON N1G 5G3, Canada, jkonzuk@geosyntec.com
219-155:15 PM TIME ESTIMATES FOR REACHING COMPLIANCE USING SOURCE REMEDIATION COMBINED WITH MONITORED NATURAL ATTENUATION: WIDDOWSON, Mark, QUESADA, Cristhian, and MENDEZ, Eduardo, Department of Civil and Environmental Engineering, Virginia Tech, 220A Patton Hall, Blacksburg, VA 24061, mwiddows@vt.edu

Back to the 2006 Philadelphia Annual Meeting (22–25 October 2006)
General Information for this Meeting