2008 Joint Meeting of The Geological Society of America, Soil Science Society of America, American Society of Agronomy, Crop Science Society of America, Gulf Coast Association of Geological Societies with the Gulf Coast Section of SEPM
Paper No. 123-8
Presentation Time: 10:10 AM-10:25 AM

Spatial Extent, Timing, and Causes of Channel Incision, Black Vermillion Watershed, Northeastern Kansas

MEADE, Benjamin, GOSSARD, Mark, and MARSTON, Richard, Department of Geography, Kansas State University, 118 Seaton Hall, Manhattan, KS 66506-2904, meade@ksu.edu

The Black Vermillion River (BVR) (watershed area = 1310 square kilometers) contributes runoff and sediment into Tuttle Creek Lake, a large federal reservoir (volume = 327 million cubic meters) northeast of Manhattan, Kansas. Tuttle Creek Lake, completed in 1962, is filling with sediment faster than other federal reservoirs in the region. The lake's conservation pool is about 40 percent full of sediment and is predicted to fill by 2023. Debate rages over the relative contribution of sediment from upland sources (largely croplands and pasture) versus channel incision. Our study determined the sediment production in BVR from channel incision, which in some places exceeds six meters. The spatial extent, timing, and causes of channel incision had not been investigated previously. We will report findings based on a watershed-wide survey of several hundred channel cross-sections repeated at sites that were surveyed 45 years ago by the Soil Conservation Service. In addition, the stage of channel evolution was evaluated using the survey method of Simon and Rinaldi (2006), modified from Simon and Hupp (1986).

Channelization has reduced channel length by 24 percent in the North Fork of BVR, 26 percent in the upper main stem of BVR, and 12 percent in lower BVR. Channelized reaches are deeply incised. The spatial pattern of incision was also related to land cover, riparian vegetation, drainage area, and geology. Upper Permian limestones and shales are dominant bedrock types in the BVR watershed. Bedrock limits channel incision in the South Fork of BVR. However, bedrock is overlain over most of the watershed by Kansan age glacial till and loess, where incision prevails and is related to upland land cover, riparian vegetation, and drainage area. Our study is part of a larger effort that will compile a sediment budget for all sources in the watershed.

2008 Joint Meeting of The Geological Society of America, Soil Science Society of America, American Society of Agronomy, Crop Science Society of America, Gulf Coast Association of Geological Societies with the Gulf Coast Section of SEPM
General Information for this Meeting
Session No. 123
Sediment in Fluvial Systems: Production, Transport, and Storage at the Watershed Scale I
George R. Brown Convention Center: 332BE
8:00 AM-12:00 PM, Sunday, 5 October 2008

Geological Society of America Abstracts with Programs, Vol. 40, No. 6, p. 93

© Copyright 2008 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.