Northeastern (46th Annual) and North-Central (45th Annual) Joint Meeting (20–22 March 2011)
Session No. 16 Sunday, 20 March 2011
1:30 PM-5:30 PM, Omni William Penn Hotel: Conference A

T18. Marcellus—Production and Disposal of Produced Water

Roman Kyshakevych and Henry Prellwitz, Presiding
 Paper #Start Time
16-11:30 PM WATER RESOURCE MANAGEMENT FOR MARCELLUS NATURAL GAS DEVELOPMENT: YOXTHEIMER, David A., Marcellus Center for Outreach and Research, Penn State, 320 Earth and Engineeering Sciences Building, University Park, PA 16802, day122@psu.edu
16-21:45 PM MARCELLUS FLOWBACK WATER GEOCHEMICAL CHARACTERISTICS FOR TREATMENT AND DISPOSAL OPTIONS: ARTHUR, Michael A., Penn State, Marcellus Center for Outreach and Research, 320 Earth and Engineeering Sciences Building, University Park, PA 16802, maa6@psu.edu
16-32:00 PM POTENTIAL FOR THE USE OF ABANDONED MINE DRAINAGE FOR HYDROFRACTURING IN MARCELLUS SHALE: VIDIC, Radisav and BARBOT, Elise, Department of Civil and Environmental Engineering, University of Pittsburgh, 949 Benedum Hall, Pittsburgh, PA 15261, vidic@pitt.edu
16-42:15 PM THE IMPACT OF MARCELLUS SHALE FORMATION GEOCHEMISTRY ON REUSE OF PRODUCTION BRINE AND FLOW BACK WATER: SVARCZKOPF, Timothy C., Atlas Energy Inc, 1550 Coraopolis Heights Road, Moon Township, PA 15108, tsvarczkopf@atlasenergy.com
16-52:30 PM STRONTIUM ISOTOPIC COMPOSITION OF FLOWBACK WATERS ASSOCIATED WITH MARCELLUS SHALE NATURAL GAS EXTRACTION, BRADFORD COUNTY, PENNSYLVANIA: CHAPMAN, Elizabeth C.1, CAPO, Rosemary C.1, STEWART, Brian W.1, KIRBY, Carl S.2, ENGLE, Mark A.3, ROWAN, Elisabeth L.3, and EDENBORN, Harry M.4, (1) Department of Geology & Planetary Science, University of Pittsburgh, Pittsburgh, PA 15260, ecf2@pitt.edu, (2) Geology Dept, Bucknell University, Lewisburg, PA 17837, (3) U.S. Geological Survey, 12201 Sunrise Valley Drive, MS 956, Reston, VA 20192, (4) Geosciences Division, National Energy Technology Lab; U.S. Department of Energy, Pittsburgh, PA 15236
16-62:45 PM NETL'S ENVIRONMENTAL RESEARCH PERTAINING TO THE DEVELOPMENT OF MARCELLUS SHALE GAS: HAMMACK, Richard W., U.S. Department of Energy, National Energy Technology Laboratory, P.O. Box 10940, Pittsburgh, PA 15236, richard.hammack@netl.doe.gov
16-73:00 PM A PROTOCOL TO CHARACTERIZE FLOWBACK WATER CONTAMINATION TO SHALLOW WATERS FROM SHALE GAS DEVELOPMENT: KIGHT, Melody D., Graduate School, SUNY-ESF, Syracuse, NY 13244, scalfone@gmail.com and SIEGEL, Donald I., Department of Earth Sciences, Syracuse Univ, 204 Heroy Geology Laboratory, Syracuse, NY 13244-1070
16-83:15 PM BASELINE WATER QUALITY STUDIES: A METHOD TO MEASURE POTENTIAL CHANGES IN ENVIRONMENTAL WATER QUALITY DUE TO MARCELLUS DRILLING ACTIVITIES: KYSHAKEVYCH, Roman, Allegheny GeoQuest, Valley Dr, Pittsburgh, PA 15215, romangkk@gmail.com
16-93:30 PM USING COAL ASH AS MINE RECLAMATION MATERIAL: LUNDY, Sherman, Elk Run Heights, IA 50707, sherml@bmcaggregates.com

Back to the Northeastern (46th Annual) and North-Central (45th Annual) Joint Meeting (20–22 March 2011)
General Information for this Meeting