A RIVER RUNS THROUGH IT – THE GEOMORPHIC IMPACTS OF THE VERMONT INTERSTATE HIGHWAY SYSTEM
Using the Landscape Change Program database (http://www.uvm.edu/landscape/) – an archive of nearly 42,000 images of Vermont spanning over 300 years and supported by the National Science Foundation and the National Endowment for the Humanities – we viewed nearly 5000 images of the interstate before, during, and after construction. These images are part of a larger collection of 36,000 images taken from 1958 to 1979, during interstate construction in Vermont.
The photographs taken during construction show the clear cutting of forests, building of cofferdams, and rerouting of rivers necessary to construct the interstate. They also show the construction of bridge piers and the placement of riprap on riverbanks to maintain and protect the structural integrity of the highway. During and immediately after construction, rivers were inundated with sediment and hill slopes were at the mercy of accelerated erosion due to the clear cutting of forests and construction of cofferdams. Rephotography of these areas shows evidence of sediment accumulation immediately adjacent to and downstream of bridge piers, revegetation of riverbanks and surrounding hillslopes, and a routing of runoff from increased amounts of impervious surface. It is apparent that even after 45 years, both the direct and the indirect effects of the interstate system are still being felt.